About

A UAE Contractor with a Group Behind It.

SWS is the UAE contracting company of the Clarity group, active since 2004.

One Group, Two Companies

Senior Water Structure

Based in
Dubai, UAE
Role
Licence, contracts, site team
Licensed for
Water Treatment & Purification Equipment Trading
  • Fountain jets rising from pavingFountains
  • Pool in front of the Crystal Inn hotel at duskPools
  • Turquoise lagoon with resort buildings and mountains behindLagoons

Our Sister Company

Company
Clarity Contracting, Cairo
Role
Engineering, equipment supply
Track record
100+ mega projects since 2004

Group Facts

  • 2004

    Founded

  • 100+

    Mega Projects, Egypt and Abroad

  • Europe + U.S.

    Where Our Equipment Is Mainly Imported From

  • In-house

    Technical Team

Trusted By

  • Orascom Construction
  • Al Marasem
  • Hassan Allam Construction
  • Concrete Plus
  • Carols Beau Rivage
  • Jaz Hotels and Resorts
  • Amer Group
  • Travco Group
  • Citystars Properties
  • The Arab Contractors
  • Dar Al-Handasah
  • Engineering Consultants Group

How a Project Runs

Stage 1

Brief and Site Review

Every project starts with listening and measuring.

  • We learn the goal, the budget and how the space will be used
  • Site visit: levels, access, power and water supply
  • Existing infrastructure checked before design starts

Stage 2

Design and Engineering

The concept becomes drawings, renders and numbers.

  • Revit drawings and specifications
  • 3D renders and an animated fly-through
  • Hydraulic design, pump and filter sizing, lighting plan

Stage 3

Supply and Installation

Equipment arrives, the structure goes in, the water goes on.

  • Equipment supplied, mainly imported from Europe and the U.S.
  • Pools, fountains and lagoons installed to the drawings
  • Pipework, filtration and controls tested end to end

Stage 4

Commissioning and Maintenance

Handover is the start of the relationship, not the end.

  • Commissioning and performance checks
  • Scheduled servicing, water treatment and repairs
  • One team that already knows the system

Selected Group Projects

All Projects

Company Details

Legal name
Senior Water Structure FZE
Trade licence number
2039
Issuing authority
Dubai Integrated Economic Zones Authority (free zone)
Licensed activities
Water Treatment & Purification Equipment Trading
Tax registration number (TRN)
100425651500001
Office
Premises DSO-ABCN-2039, HQ Building,
Dubai Silicon Oasis, Dubai, United Arab Emirates

Planning a Water Feature in the UAE?

Talk to Us